Completed Projects

Completed Projects

We have the highest concern and commitment for protecting the Health and Safety
of all employees, contractors, customers and the communities in which 

Construction of Balance work at VUP & it’s approached at Km 802+375 at PSTR, & Construction of Balance works at Ch 805+921, widening of MNB and Service Road work at LHS side along Pune Satara Toll Road. & Construction of Balance unhindered work from Chainage Km 725.000 to Km 820.000 at Pune- Satara Toll Road Project(PSTR)
Periodic maintenance # MMR work (Overlay & Micro surfacing and other works) along Gurgaon Faridabad Toll Road, Haryana
Maintenance work of NH-6 Surat Hazira Tollway Pvt Ltd work 21 22, 340 Soma Roadis,0 Milling of existing bituminous surface work up to 30 mm an crushed aggregates of grading-II, premixed with bituminous, binder and filler, Transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control, to the required grade. Required rolling up to Minimum 98%, of marshal density.VG-30 Bitumen.
The Scope of works such as DBM/BC laying, provision of kerb, Provision of Pipe Drain, Slope Protection works, embankment/sub grade, Installation of Bus shelters works at the locations as & when directed by Authorized Representative of SDPL
Road Restoration work under change of Scope along Gurgaon Faridabad Toll Road
Six Lanning of Pune, Satara section of NH4 from km, 725.00 to km. 865.35 (Lenth – m 140.35) in the state of Maharashtra to be executed as BOT (TOLL) on DBFOT pattern under NHDP Phase V (Project Highway). Balance Works of Project Highway from Ch. 865+350 at Pune Satara Toll Road Project- Drain Work & GSB & WMM, Kerb Laying & Retaining Wall Work.

Road Work- Drain Work & GSB & WMM, Kerb Laying, Construction of Precast RCC Crash Barrier & Maintenance

Road Work- Drain Work & GSB & WMM, Kerb Laying, Construction of Precast RCC Crash Barrier